In this aircraft teardown project, ARTS Group bought a retired ATR 72-500, dismantled it in its own hangar in Toulouse and sold around 95% of the harvested parts to OEMs, MROs and parts traders in Europe and the Americas. The bare fuselage stays in Toulouse and now serves a non-airworthy R&D display project.
This success story shows how an aircraft teardown runs when one group handles acquisition, dismantling, storage and sales.
Project facts
- Aircraft: ATR 72-500, MSN 826, built 2008
- Location: ARTS H16 hangar, Toulouse, France
- Teardown period: 2024 to 2025
- Harvested: approximately 300 line items
- Sold: approximately 95% of the harvested inventory
- Buyers: aircraft and component OEMs, MRO organisations and parts traders in Europe and the Americas
ATR 72-500 parts still available | A limited quantity of harvested material is available.
The aircraft
MSN 826 was built in 2008 and last flew with Fly540 Angola. After its operational service, the aircraft passed through several lessors.
ARTS Group bought it on an as-is, where-is basis. At that point, the aircraft was already parked in Toulouse.
ARTS acted as principal throughout the project. The group invested its own capital, took ownership of the complete aircraft and carried the commercial risk of selling the parts.
How the aircraft teardown worked
The ARTS team carried out every step in-house at the H16 hangar in Toulouse during 2024 and 2025.
- Removal of the major assemblies: landing gear components, flight control surfaces, wheels and brakes, generators and avionics computers.
- Detailed part-out of further components with resale value.
- Tagging and identification of every removed item.
- Transfer into the ARTS storage facility as individually managed inventory.
- Packaging and sale through the ARTS Aviation Asset Management team in Dubai.
In total, the team harvested approximately 300 line items from MSN 826.
Component condition and traceability
ARTS sold the components in the condition they were removed: AR (As Removed) or U/S (Unserviceable). Each buyer decides on the next step, such as inspection, repair or overhaul.
A harvested part returns to service only after an approved maintenance organisation has inspected or repaired it and issued release documentation, for example an EASA Form 1 or FAA Form 8130-3.
Parts sales through ARTS in Dubai
The ARTS Aviation Asset Management team in Dubai handled the commercial side. The team placed the parts with several buyers according to market demand instead of selling the inventory in one bulk deal.
Buyers included aircraft and component OEMs, MRO organisations and aviation parts traders in Europe and the Americas. Approximately 95% of the harvested inventory has been sold. A limited quantity of ATR 72 parts from MSN 826 is still available.
A second use for the fuselage
After the part-out, the bare fuselage remained in the H16 hangar. ARTS now uses it for a non-airworthy R&D display project.
Aircraft teardown for third-party owners
ARTS also performs aircraft teardown and part-out of end-of-life aircraft for lessors, operators and other aircraft owners. Teams work in the Toulouse hangar or on site where the aircraft is parked. On-site work helps when a ferry flight or transport to a teardown facility is no longer economical.
The H16 hangar at Toulouse-Blagnac Airport holds one narrowbody or two regional aircraft. Widebodies and other aircraft that exceed the hangar capacity can be handled on the dedicated outdoor apron, at partner facilities or at their current location.
For ATR 72-500 parts, aircraft teardown projects or aviation asset management enquiries, contact the ARTS Aviation Asset Management team in Dubai: dubai@arts.aero
FAQ Aircraft Teardown
An aircraft teardown is the planned dismantling of a retired aircraft to recover components for reuse. Technicians remove major assemblies and smaller parts, tag and document each item and transfer it into inventory for repair, overhaul or resale. The terms part-out and aircraft dismantling describe the same process.
ARTS Group performs aircraft teardown and part-out at its H16 hangar in Toulouse, France, and on site at the aircraft's location. The ARTS Aviation Asset Management team in Dubai sells the harvested parts to OEMs, MROs and parts traders worldwide.
Owners usually choose between continued operation with a new operator, storage, sale of the complete aircraft, or teardown and part-out. A part-out makes sense when the individual components are worth more than the aircraft as a whole. The decision depends on the recoverable components, the aircraft's condition, teardown, transport and storage costs, and current demand for parts.
AR (As Removed) means the part was taken off the aircraft without further inspection or testing. U/S (Unserviceable) means the part is not fit for installation in its current state. In both cases, the buyer arranges inspection, repair or overhaul before the part can return to service.
Yes, after an approved maintenance organisation has inspected, repaired or overhauled the part and issued release documentation such as an EASA Form 1 or FAA Form 8130-3. Traceable records from the teardown support this process. For MSN 826, ARTS tagged and identified every removed item before it went into inventory.
Yes. Depending on the project, ARTS performs the teardown in its Toulouse hangar or on site where the aircraft is parked. On-site teardown helps when a ferry flight or transport to a teardown facility is no longer economical. Aircraft that exceed the hangar capacity can also be handled at partner facilities.
ARTS Group France is certified to ISO 14001 for environmental management and to ISO 9001 and EN 9100 for quality management. The ARTS Aviation Asset Management team in the United Arab Emirates, which sells the harvested parts, is certified to AS 9120:2016, the quality standard for aviation parts distributors.
Yes. The H16 hangar at Toulouse-Blagnac Airport (TLS) holds one narrowbody or two regional aircraft and has a dedicated parking apron with direct airside access. ARTS offers short-term and long-term storage with interval inspections, corrosion control, preservation of engines and APU, and full documentation for each aircraft. Reactivation includes de-preservation, system checks, documentation updates and functional tests.
Sources
- ARTS Group, Our Certifications (retrieved 2026)